best magento templates for your store designed by zingthemes.com, vietnam visa services, vietnam visa home, vietnam visa trip, magento templates, best magento templates for your store, bestmagento templates, 2 cong ty bao ve, 2 dich vu bao ve, 2 bao ve, thoi trang, thoi trang, website chinh phu viet nam, cong thong tin chinh phu viet nam gia vang hom nay, web design blog tin tuc, suc khoe doi song, tin tuc moi online, tin moi 360, tin tuc online, giai tri 24h thiet ke website, thu thuat cong nghe, thoi bao cong nghe, dien thoai sky gia re, magento themes, euthemes.com, themetalent.com, wpdance.com

Vantage Goldfields

Youtube Corporate video

Corporate Video: Operations

Worcester Project PDF  | Print |  E-mail

Worcester Mine Project

A pre-feasibility study was completed on the Worcester Project to determine the economic viability of mining the Mineral Resources delineated to date below the old mine workings.
The study investigated the viability of applying low cost, bulk mining methods to the Indicated Mineral Resources situated between 210m and 560m below surface. The steeply dipping Worcester mineralised zone, which contains free-milling gold, is amenable to mechanised mining by means of continuous retreat open-stoping.  

Based on the mine design, and after applying appropriate economic and modifying factors, an Ore Reserve of some 1.4 million tonnes at a grade of 3.01 g/t (equivalent to 133,000 oz) can be mined over 10 years at a production rate of 150,000 tonnes per year.

Although results of the pre-feasibility study indicate that the project has an IRR of 24%, the proposed mining operation is not regarded as being sufficiently robust to justify a more detailed engineering study at this stage. Instead, the exploration program in and around the Worcester Project area continues to concentrate on delineating additional Mineral Resources in an attempt to provide economies of scale to the project.